What's delivery time?
I'm saying 8 to 12 weeks.
The OEM has been pretty busy with NAMM work, but that may be quieting down.
I had both an 8-week and 10-week neck ship this week.
Back to the builds:Next, I Dremel a groove for the wiring harness to clear the large CTS pots, and then drill the string-through holes:
Here's how I ensure the ferrules holes drilled from the back line up with the string-through holes drilled from the front:
Ferrules hole drilled SLOWLY, then they are installed:
Necks getting strings and guides:
And a gallery shot: